SHOREHAM VIADUCT WITH BAM NUTTALL

 

SCOPE OF WORKS: WET BLASTING TO SA2.5 AND NETWORK RAIL PAINTING SPEC M21/M24

 

PROJECT DESCRIPTION: Paint refurbishment of Shoreham Rail Viaduct. The viaduct comprised of 16 spans which span the river Adur. The structure comprised of steel girders (parapets and support girders) and cross girders supporting solid deck plates.

  STEWARTS LANE TRAIN DEPOT WITH BAM NUTTALL

 

SCOPE OF WORKS: ST3 PREP AND NETWORK RAIL PAINTING SPEC XM92/M24

 

PROJECT DESCRIPTION: Paint refurbishment of Stewarts Lane Train Depot. The project was split in two main areas (1) roof level - roof trusses, and (2) lower level - columns and cross members. Our scope included preparing all steelwork elements to an ST3 standard, abrading remaining sound coatings, and then applying XM92/M24 paint system.

 

 

 

 

 

SURFACE PREPARATION AND CLEANING  |  ABRASIVE BLAST CLEANING  |  ULTRA HIGH PRESSURE JET WASHING (UHP)

APPLYING PROTECTIVE COATING SYSTEMS  |  INTUMESCENT FIRE PROTECTION PAINT SYSTEMS  |  WORKING TO NETWORK RAIL SPECIFICATIONS WORKING TO T50 TIMBER SPECIFICATIONS

Address

3 Shawcross Industrial Estate

Ackworth Road, Hilsea, Portsmouth, PO3 5JP



 

Bridgecoat Ltd

info@bridgecoat.co.uk

Website Design by Bixel

 

 

 

 

Telephone

02392 666161

 

We were responsible for surface preparation Wet Blast Clean to SA2.5 to all corroded areas, Stripe Coating, and the subsequent application of a 4-Coat Jotamastic paint system in accordance with Network Rail Spec XM92/M21 & XM92/M24.

Access to the high level was off scaffold, and lower level work was accessed via cherry pickers and mobile towers. All works were carried out and completed in accordance with Network Rail specification NR/L3/CIV/040.